Skip to content

Why is testing required?

On Feb. 1, 2021 there was a amendment to the WA State Residential Energy Code that requires independent 3rd party testing:

C406.9 Reduced air infiltration. Air infiltration shall be verified by whole building pressurization testing conducted in accordance with ASTM E779 or ASTM E1827 by an independent third party. The measured air leakage rate of the building envelope shall not exceed 0.25 cfm/ft2 (2.0 L/s•m2 ) under a pressure differential of 0.3 in. water (50 Pa), with the calculated surface area being the sum of the above and below grade building envelope. A report that includes the tested surface area, floor area, air by volume, stories above grade, and leakage rates shall be submitted to the code official and the building owner.

What is included in Air Leakage Test?

  • Calculate square footage and building volume.
  • Set up blower door and measure air leakage.
  • Calculate ACH50 (air exchanges per hour at 50 pascals).
  • We provide you with an electronic file summary of the test results.
  • We provide you with a printed WSEC Affidavit posted on site.
  • We provide you with a WSEC stick posted on electrical panel.

Pre- Blower Door Checklist

  1. Water in all P-traps, tubs, showers, sinks, etc.
  2. Electrical trim and finish completed.
  3. Fan venting complete with terminations.
  4. Attic access cover with weatherstripping.
  5. Attic and crawl space access cover with weatherstripping.
  6. All thermal wall and ceiling assemblies with sheetrock finish complete.
  7. All exterior doors with thermal gaskets installed.
  8. Fireplace and hearth finish complete.
  9. All floor coverings complete with base trim.
  10. Access to 110V plugin for blower door power.

Services

  • Residential Blower Door Testing to meet the updated Washington State RESNET 380-2019 requirements.
  • Blower Door Testing for European Standard ISO-9972 for passive homes.
  • Duct Leakage Testing to RESNET standard 380-2016 (can be performed at rough-in or at finish).
  • Exhaust Fan Passive Resistance Test to RESNET standard 380-2016.

Additional travel cost may apply depending on location

Payment can be made by credit card, Cash app or Venmo.

Call for a FREE Estimate (see contact info below).

Why use Eric?

  • Over 40 years experience in the insulation and energy business
  • Has been testing since 2010
  • W.S.E.C. Residential Certified
  • Building Performance Institute (B.P.I.) Certified
  • Retrotec Certified
  • Fully licensed and insured in Washington State (UBI# 604942895)
  • Uses the best, up-to-date testing equipment
  • 48-hour scheduling

Customers that trust Eric

Eric's always on time and professional. - Mel Shilley, Phoenix Construction, Chelan, WA

Can always count on Eric!  - Ray Perez, Ray's Construction Consulting, Wenatchee, WA

I have used Eric on many of my projects over the years. - Devin Casto, Casto’s Inland Group, Cle Elum, WA

Will continue to Use Eric's service. - Todd Ingles, Prairie Homes, Ellensburg, WA

Schedule a test today

Contact Eric direct by email, text, or phone to schedule and date and time (see contact info below).

Website Design by Simplimation